EDUCATION AND DOCTRIN COMMAND 027-040 ALBUM BUILDING BOILER AND HEATING SYSTEM INSTALLATION RENOVATION AND GENERAL REPAIR CONSTRUCTION
The mechanical installation works of the military family guesthouse consists of 2 units (a total of 40 flats) consisting of a total of 4700 M2 closed area and was completed as a key delivery of 110.000.000.000 TL + VAT with the price of 2004.Within the scope of manufacturing, the existing boiler flats of 2 blocks have been dismantled and the construction and mechanical installation has been completely renewed.In addition, heating and ventilation of 40 guesthouses have been restored.A total of 130 meters panel radiator installation and piping with 600.000 kcal / H capacity 2 Boiler Room installation works.




